Cygni Energy, Indus Towers ink MoU
Under the MoU, the proposed collaboration includes plans to establish battery energy storage system (BESS) manufacturing capacity of up to 1.5 GWh to address the evolving energy requirements of telecom infrastructure in India
Under the MoU, the proposed collaboration includes plans to establish battery energy storage system (BESS) manufacturing capacity of up to 1.5 GWh to address the evolving energy requirements of telecom infrastructure in India
Business Line - Home
This report is indexed by BAGANBAZAR GRAPH with its original publisher named and linked for readers.
Read at original outlet ↗